Got a bit done today. Painted the dining room. Including the baseboards. I do have to do some touching up after the current paint dries. I even applied a coat of primer as mentioned.
Got the sunken living room floor polished. Looks good.
Got up on the roof and patched some areas pointed out by the inspector. Still have more of that to do because the roof has to be dry. It rained for a short while, so not all the roof was dry. The parts I patched were dry. I think the remaining part will take maybe 1-2 hours at most. Happily, this stuff spreads pretty far so I'll definitely have enough with just the one bucket. I took a good look and the parts around the edges that need patching is really only a few inches and only over the sunken living room and dining room.
I'm going to start packing the van tomorrow. Anything I won't need for the following three days can be packed and loaded now. No more need to wait.
Got the sunken living room floor polished. Looks good.
Got up on the roof and patched some areas pointed out by the inspector. Still have more of that to do because the roof has to be dry. It rained for a short while, so not all the roof was dry. The parts I patched were dry. I think the remaining part will take maybe 1-2 hours at most. Happily, this stuff spreads pretty far so I'll definitely have enough with just the one bucket. I took a good look and the parts around the edges that need patching is really only a few inches and only over the sunken living room and dining room.
I'm going to start packing the van tomorrow. Anything I won't need for the following three days can be packed and loaded now. No more need to wait.